BHEL Floats Tender For 1200 MW Khavda Solar PV Plant In Gujarat

Representational image. Credit: Canva

Bharat Heavy Electricals Limited (BHEL), Solar Business Division, Bengaluru, has issued a global tender under Tender No. TGPWCC0038. This tender is for a pre-bid tie-up for the selection of a contractor for design, engineering, supply, construction, erection, testing, and commissioning, including three years of operation and maintenance (O&M) for a (4x300MW) Khavda Solar PV plant. The scope of the project also includes a power evacuation system but excludes the supply of PV modules and trackers. The project is located in Khavda, Kutch, Gujarat.

This is a single-stage, two-part bid process conducted through email submission. The technical bid and price bid should be submitted in password-protected PDFs. The first half of the password is to be shared with the BHEL WCC executive, and the second half with the BHEL finance executive, both on the day of the tender opening.

The pre-bid meeting is scheduled for 17th March 2025 from 2:00 PM to 3:00 PM via video conference. Interested bidders can request the meeting link from the dealing officer by email.

The contract includes four parts: Supply of all items required for the commissioning of the project (except PV modules and trackers) along with mandatory spares, with a duration of 15 months. Erection and commissioning work, also with a duration of 15 months. Comprehensive O&M of the project for three years, starting after the completion of parts 1 and 2. Comprehensive AMC for critical items for seven years from the O&M completion date. The earnest money deposit (EMD) is INR 10,00,000 per block of 300 MW. If a bidder quotes for multiple blocks, the EMD increases accordingly: 2 blocks (600 MW): INR 20,00,000, 3 blocks (900 MW): INR 30,00,000, 4 blocks (1200 MW): INR 40,00,000.

The EMD must be submitted by electronic fund transfer to BHEL-SBD Bengaluru’s account before the Part A bid opening. If submitted via demand draft (DD), the original DD must reach BHEL-SBD within seven days of the Part A bid opening.

The performance bank guarantee (PBG) requirements are as follows: 10% of the contract value for supply and I&C portions, valid until completion of installation, commissioning, and receipt of the commission report from the end customer. 10% of the O&M contract value, valid until the plant is handed over to the end customer. 0.5% of the total contract value for AMC, valid for the complete AMC period.

The contract will be awarded based on the lowest price quoted in INR per MW. Price reduction during negotiation with the customer will lead to a corresponding reduction for the vendor.

BHEL reserves the right to split quantities and allocate plots based on the bidder’s participation and acceptance of L1 prices. No reverse auction will be conducted for this tender.

The project aims to ensure timely execution and quality performance, contributing to the renewable energy capacity in India. Interested bidders must meet the technical and financial qualifying requirements specified in the tender documents and submit their bids within the stipulated timeframe.

 

  • Related Posts

    Recurrent Energy Secures €1.3 Billion Credit Facility To Accelerate Renewable Expansion Across Europe

    Solar panels and wind turbines exemplify sustainable energy financing in Europe. Recurrent Energy, a global developer of solar and energy storage projects and part of Canadian Solar, has secured a…

    Solar Adoption In Singapore Condominiums Faces Cost, Design, And Consensus Challenges

    Representational image. Credit: Canva Singapore’s efforts to expand solar energy adoption are encountering notable challenges in private residential developments, particularly condominiums. While the country has set ambitious sustainability targets and…

    Have You Seen?

    Oilfield Service Firm Halliburton is Discussing Commercial Terms With Customers for Venezuela Operations

    • April 22, 2026
    Oilfield Service Firm Halliburton is Discussing Commercial Terms With Customers for Venezuela Operations

    North Dakota Crude Output to Rise as Operators Eye High Oil Prices

    • April 22, 2026
    North Dakota Crude Output to Rise as Operators Eye High Oil Prices

    China’s CATL Debuts EV Battery With Speedy Six-Minute Recharge and a 1,000-km Range

    • April 22, 2026
    China’s CATL Debuts EV Battery With Speedy Six-Minute Recharge and a 1,000-km Range

    Norway Pumps Near Capacity as Spare Output Buffer Disappears

    • April 21, 2026
    Norway Pumps Near Capacity as Spare Output Buffer Disappears

    Sanctioned Iranian VLCC Crosses Hormuz Line Hours Before Ceasefire Deadline

    • April 21, 2026
    Sanctioned Iranian VLCC Crosses Hormuz Line Hours Before Ceasefire Deadline

    Activists Sue Shell Over Emissions, Again

    • April 21, 2026
    Activists Sue Shell Over Emissions, Again

    Long-Haul Flight Fares Soar as Iran War Hits European Aviation Hard

    • April 21, 2026
    Long-Haul Flight Fares Soar as Iran War Hits European Aviation Hard

    Iran, US Talks Hit Impasse as Truce Nears Expiry

    • April 21, 2026
    Iran, US Talks Hit Impasse as Truce Nears Expiry

    US Crude and Fuel Exports Surge to Record Highs, But it’s Not Enough: Russell

    • April 21, 2026
    US Crude and Fuel Exports Surge to Record Highs, But it’s Not Enough: Russell

    Trump Says He Does Not Want to Extend Ceasefire With Iran

    • April 21, 2026
    Trump Says He Does Not Want to Extend Ceasefire With Iran