BHEL Floats Tender For 1200 MW Khavda Solar PV Plant In Gujarat

Representational image. Credit: Canva

Bharat Heavy Electricals Limited (BHEL), Solar Business Division, Bengaluru, has issued a global tender under Tender No. TGPWCC0038. This tender is for a pre-bid tie-up for the selection of a contractor for design, engineering, supply, construction, erection, testing, and commissioning, including three years of operation and maintenance (O&M) for a (4x300MW) Khavda Solar PV plant. The scope of the project also includes a power evacuation system but excludes the supply of PV modules and trackers. The project is located in Khavda, Kutch, Gujarat.

This is a single-stage, two-part bid process conducted through email submission. The technical bid and price bid should be submitted in password-protected PDFs. The first half of the password is to be shared with the BHEL WCC executive, and the second half with the BHEL finance executive, both on the day of the tender opening.

The pre-bid meeting is scheduled for 17th March 2025 from 2:00 PM to 3:00 PM via video conference. Interested bidders can request the meeting link from the dealing officer by email.

The contract includes four parts: Supply of all items required for the commissioning of the project (except PV modules and trackers) along with mandatory spares, with a duration of 15 months. Erection and commissioning work, also with a duration of 15 months. Comprehensive O&M of the project for three years, starting after the completion of parts 1 and 2. Comprehensive AMC for critical items for seven years from the O&M completion date. The earnest money deposit (EMD) is INR 10,00,000 per block of 300 MW. If a bidder quotes for multiple blocks, the EMD increases accordingly: 2 blocks (600 MW): INR 20,00,000, 3 blocks (900 MW): INR 30,00,000, 4 blocks (1200 MW): INR 40,00,000.

The EMD must be submitted by electronic fund transfer to BHEL-SBD Bengaluru’s account before the Part A bid opening. If submitted via demand draft (DD), the original DD must reach BHEL-SBD within seven days of the Part A bid opening.

The performance bank guarantee (PBG) requirements are as follows: 10% of the contract value for supply and I&C portions, valid until completion of installation, commissioning, and receipt of the commission report from the end customer. 10% of the O&M contract value, valid until the plant is handed over to the end customer. 0.5% of the total contract value for AMC, valid for the complete AMC period.

The contract will be awarded based on the lowest price quoted in INR per MW. Price reduction during negotiation with the customer will lead to a corresponding reduction for the vendor.

BHEL reserves the right to split quantities and allocate plots based on the bidder’s participation and acceptance of L1 prices. No reverse auction will be conducted for this tender.

The project aims to ensure timely execution and quality performance, contributing to the renewable energy capacity in India. Interested bidders must meet the technical and financial qualifying requirements specified in the tender documents and submit their bids within the stipulated timeframe.

 

  • Related Posts

    Global Energy Transition Requires 38.2 TW Renewable Capacity by 2050, Stronger Grids and Energy Efficiency – Report

    The global energy transition is entering a decisive phase, driven by record renewable energy deployment, declining technology costs and increasing electrification across transport, buildings and industry. However, progress remains uneven…

    Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat

    Solidus Techno Power Private Limited has announced the successful delivery of a 27.31 MWh Battery Energy Storage System (BESS) integrated with a 50 MW solar power project for SBF Ispat…

    Have You Seen?

    Global Energy Transition Requires 38.2 TW Renewable Capacity by 2050, Stronger Grids and Energy Efficiency – Report

    • October 24, 2026
    Global Energy Transition Requires 38.2 TW Renewable Capacity by 2050, Stronger Grids and Energy Efficiency – Report

    Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat

    • October 24, 2026
    Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat

    ACCIONA Energía Starts Operations Of 72 MW Wind Farms In Croatia

    • October 24, 2026
    ACCIONA Energía Starts Operations Of 72 MW Wind Farms In Croatia

    Solidus Techno Power Delivers 27.31 MWh BESS For SBF Ispat’s 50 MW Solar Project

    • October 24, 2026
    Solidus Techno Power Delivers 27.31 MWh BESS For SBF Ispat’s 50 MW Solar Project

    Kerala Engineering College Invites Tender For Green Hydrogen Research Equipment

    • October 24, 2026
    Kerala Engineering College Invites Tender For Green Hydrogen Research Equipment

    RE:MAKE India 2026 to Connect Renewable Energy Manufacturing, Technology and Supply Chains at Yashobhoomi

    • October 24, 2026
    RE:MAKE India 2026 to Connect Renewable Energy Manufacturing, Technology and Supply Chains at Yashobhoomi

    NVVN Invites Bids For Rooftop Solar Project At NIB Noida

    • October 24, 2026
    NVVN Invites Bids For Rooftop Solar Project At NIB Noida

    Fourth Partner Energy Executes 75 MWp Open Access Solar Park In Maharashtra

    • October 24, 2026
    Fourth Partner Energy Executes 75 MWp Open Access Solar Park In Maharashtra

    Three Weeks to Go: Thailand Clean Energy Week 2026 Brings Industry Leaders Together in Bangkok

    • October 24, 2026
    Three Weeks to Go: Thailand Clean Energy Week 2026 Brings Industry Leaders Together in Bangkok

    Buskowitz Energy Wins Company of the Year – Solar EPC (Commercial/Industrial)

    • October 24, 2026
    Buskowitz Energy Wins Company of the Year – Solar EPC (Commercial/Industrial)