JinkoSolar Commissions 21.6 MWh of Energy Storage Systems in Massachusetts in Partnership with DEI

JinkoSolar Holding Co., Ltd. has successfully commissioned 21.6 MWh of energy storage systems supplied to Distributed Energy Infrastructure (DEI). This milestone advances clean, reliable, and dispatchable energy in Massachusetts under the Solar Massachusetts Renewable Target (SMART) program.

The three energy storage systems, developed and built by DEI, are now fully operational and delivering key grid services while enhancing the performance and resilience of solar assets across the state. Each installation incorporates a combination of DC and AC coupled configurations, designed to optimize operational flexibility and system performance.

JinkoSolar’s U.S.-based energy storage engineering team played a critical role in system design and integration, ensuring compatibility with a variety of Power Conditioning Systems (PCS) and Energy Management Systems (EMS). The collaboration highlights JinkoSolar’s commitment to delivering high-performance, market-adaptive storage solutions that meet the demands of a transitioning energy landscape.

“Collaborating with DEI on these projects has been a great opportunity to showcase the value of JinkoSolar’s U.S. energy storage solutions and our local engineering expertise,” said Jeff Juger, Deputy General Manager and Head of ESS at JinkoSolar (U.S.) Inc. “We are proud to support DEI’s fully integrated project delivery model and shared vision of accelerating the transition to a cleaner grid.”

“These projects represent a key milestone in DEI’s mission to bring resilient, clean energy solutions to the communities we serve,” said Sean Harrington, CEO and Founder of Distributed Energy Infrastructure. “We chose JinkoSolar to supply the batteries for this portfolio due to their strong U.S.-based service team, more than 15 years of experience supporting similar projects, and their proven, robust technology. Working directly with JinkoSolar’s U.S.commissioning team helped us streamline system integration and accelerate time to operation — ensuring our clients received the full benefit of a tightly managed, end-to-end solution.”

DEI led the project execution end-to-end, including development support, procurement, system design, construction, and commissioning. This integrated approach enabled efficient deployment and minimized typical risks and delays, particularly during the construction and commissioning phases.

 

  • Related Posts

    Philippine National Bank Backs PHP 6.22 Billion Solar And Battery Storage Project In Iloilo

    Philippine National Bank (PNB) is supporting a 6.22 billion peso co-financing package for a major clean energy project in Barotac Viejo, Iloilo, Philippines. Developed by Singapore-based Levanta Renewables, the project…

    SEPCOIII Begins Full Commercial Operation Of Saudi Red Sea Utility Project

    Chinese engineering company SEPCOIII has achieved full commercial operation of the Saudi Red Sea Utility Infrastructure Project, marking a major milestone in the development of renewable-powered tourism infrastructure. The project…

    Have You Seen?

    Philippine National Bank Backs PHP 6.22 Billion Solar And Battery Storage Project In Iloilo

    • August 31, 2026
    Philippine National Bank Backs PHP 6.22 Billion Solar And Battery Storage Project In Iloilo

    SEPCOIII Begins Full Commercial Operation Of Saudi Red Sea Utility Project

    • August 31, 2026
    SEPCOIII Begins Full Commercial Operation Of Saudi Red Sea Utility Project

    India Daily: MPERC Drafts MYT Rules, APSERC Reviews 2.75 MW Solar, HERC Clears Green Banking, TGERC Closes Dues Case, UPERC Completes ₹32.74 Cr Refund & More…

    • August 31, 2026
    India Daily: MPERC Drafts MYT Rules, APSERC Reviews 2.75 MW Solar, HERC Clears Green Banking, TGERC Closes Dues Case, UPERC Completes ₹32.74 Cr Refund & More…

    Iraq Plans 10 GW Solar Expansion To Tackle Power Shortages

    • August 31, 2026
    Iraq Plans 10 GW Solar Expansion To Tackle Power Shortages

    Green Energy Stocks Under Pressure As Indian Markets End Lower On August 31

    • August 31, 2026
    Green Energy Stocks Under Pressure As Indian Markets End Lower On August 31

    KPI Green Energy Advances 2.57 GWp IPP Portfolio, 1.16 GWp Energized

    • August 31, 2026
    KPI Green Energy Advances 2.57 GWp IPP Portfolio, 1.16 GWp Energized

    Tata Power Renewable Energy Commissions 100 MW Group Captive Solar Project In Tamil Nadu

    • August 31, 2026
    Tata Power Renewable Energy Commissions 100 MW Group Captive Solar Project In Tamil Nadu

    Australia Accelerates Next-Generation Solar R&D with $105.6 Million Technology Push

    • August 31, 2026
    Australia Accelerates Next-Generation Solar R&D with $105.6 Million Technology Push

    Global Specialty Gas Supply Chain Outlook – H1 2026

    • August 31, 2026
    Global Specialty Gas Supply Chain Outlook – H1 2026

    UPERC Approves 300 MW Solar PPA At INR 2.57/kWh For 25 Years In Uttar Pradesh

    • August 31, 2026
    UPERC Approves 300 MW Solar PPA At INR 2.57/kWh For 25 Years In Uttar Pradesh