LCOE Analysis of Tiger Neo 3.0 and BC

The PV industry has never stopped its pursuit of higher energy efficiency, as TOPCon becoming dominant technology, Jinkosolar continues to push the bleeding edge to raise the bar of cell efficiency over 27%.  Its latest Tiger Neo 3.0 claimed of 650-670Wp power output, 85+/- 5% Bifacility, -0.26% temp coefficient, -0.35% linear degradation, 96.77% low irradiance performance (200W/m²), etc., provides chance of lowering the levelised cost of energy (LCOE)than traditional TOPCon and N-type BC.

This paper is purposed to compare the LCOE of Tiger Neo 3.0 and its N-type BC in different scenarios as follows, based in the supposition that the price of Tiger Neo 3.0 is same with N-BC module,module information is listed in table 1. We chose four project scenarios (two rooftop, two utility scale) and four locations with typical climate features, irradiance levels and balance of system (BOS) cost levels.

Energy generation is simulated with the PVsyst software. The Tiger Neo 3.0 and N-type BC module PAN file is based on the actual performance provided by Jinkosolar while the PAN files of N-type BC are based on a general industry-wide performance level.

We chose four typical locations, including Kagoshima (Japan), Berlin (Germany), Dubai (UAE), Qinghai (China). Their annual average irradiance and annual average temperature are listed in table 2.

The calculation for LCOE is the net present value of total life cycle costs of the project, divided by the net present value of energy produced over the system’s lifetime. The total life cycle costs can be disaggregated as initial investment, annual cost, depreciation tax benefit and system residual value. The initial investment (US$/Wdc) is the sum of the BOS cost and the module price. Module prices and BOS cost of Tiger Neo 3.0 and N-type BC are assumed to be the same at each location.

The AC capacity of the utility-scale plant is designed to be 100MW, 1500V system voltage, single axis tracker, albedo 30% in Dubai and 120MW, 1500V system voltage, fixed mounted, 20% albedo in Qinghai . The system lifetime is 30 years.

Results

The energy yield gain of Tiger Neo 3.0 over N-type BC at modeled Dubai and Qinghai utility project is 3.52% and 3.28% respectively, primarily attributed to Tiger Neo 3.0’s  higherbifacility and outstanding performance at high temperature. Set LCOE of BC as baseline, the LCOE of Tiger Neo 3.0 is 3.45% and 3.60% lower in Dubai and Qinghai.

In contrast, the two rooftop projects of 500kW in Kagoshima,Japan and 1MW Berlin German features of low contribution of bifacility result in the less energy yield gain over BC of 0.54% and 0.77% respectively mainly due to better low light performance of Tiger Neo 3.0 as shown in table 3. Set LCOE of BC as baseline, the LCOE of Tiger Neo 3.0 is 1% and 1.11% lower in Kagoshima amd Berlin.

The two products of same power exhibit different performance in energy generation due to their differences in bifacial factors, performance in low irradiance, first-year degradation values which can be primarily attributed to light-induced degradation (LID).

Conclusion

It should be pointed out that the module prices of Tiger Neo 3.0 and N-type BC and BOS cost are assumed to be the same in LCOE analysis. In most cases, the LCOE of Tiger Neo 3.0 is lower  than N-type BC, and more competitive with fixed mounted or tracker system, high ground albedo, high temperature. In rooftop systems where bifacility advantage can not play to full, the better low irradiance performance of Tiger Neo 3.0 translates into longer working hour, which allows it to perform well throughout the year.

Regarding energy generation, Tiger Neo 3.0 is higher than N-type BC, especially in hot and sunny regions with high albedo. This is due to their advantage of high bifaciality and low temperature coefficient. On the other hand, in rooftop installations, particularly in high latitude with low  irradiance or humid regions with more rainy and cloudy weather, the advantage of low light performance of Tiger Neo 3.0 prolongs the generation hour per day and per year. In LCOE analysis, Tiger Neo 3.0 has the high priorities in most scenarios and all climate and environment.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    DNV Study Highlights FTC Solar Pioneer Constructability and Robotics Potential

    EXPLOSION NEW DNV assessment highlights Pioneer’s simplified installation process and approximately 81 person-hours per MWdc for measured tracker and module assembly activities FTC Solar, Inc. (FTCI), a leading provider of…

    Peñoles And Atlas Renewable Energy Sign 20-Year Solar And Battery Storage Agreement In Mexico

    Peñoles has signed a 20-year agreement with Atlas Renewable Energy for a 269 MWp solar project with battery storage in Coahuila, beginning operations in 2029. Expected to supply 550 GWh…

    Have You Seen?

    The Middle East War Has Wiped 2.8 Billion Barrels Off Global Oil Supply

    • November 19, 2026
    The Middle East War Has Wiped 2.8 Billion Barrels Off Global Oil Supply

    India’s Oil Imports Hit Record High as Saudi Shipments Surge

    • November 19, 2026
    India’s Oil Imports Hit Record High as Saudi Shipments Surge

    Global Cooling Demand Overtakes Heating for the First Time

    • November 19, 2026
    Global Cooling Demand Overtakes Heating for the First Time

    China Coking Coal Hits Three-Month Low as Supply Recovers

    • November 19, 2026
    China Coking Coal Hits Three-Month Low as Supply Recovers

    USA, China, Russia Agree to Increase Supply of Global Fuels

    • November 19, 2026

    Avanti advances towards plant installation at Montana helium project

    • November 19, 2026
    Avanti advances towards plant installation at Montana helium project

    DNV Study Highlights FTC Solar Pioneer Constructability and Robotics Potential

    • November 19, 2026

    Peñoles And Atlas Renewable Energy Sign 20-Year Solar And Battery Storage Agreement In Mexico

    • November 19, 2026
    Peñoles And Atlas Renewable Energy Sign 20-Year Solar And Battery Storage Agreement In Mexico

    Philippines Approves PHP 745 Billion In Renewable Energy Investments, Capturing 79% Of BOI Approvals

    • November 19, 2026
    Philippines Approves PHP 745 Billion In Renewable Energy Investments, Capturing 79% Of BOI Approvals

    UK biomethane producers seek ETS recognition in UK-EU carbon market deal

    • November 19, 2026
    UK biomethane producers seek ETS recognition in UK-EU carbon market deal