LCOE Analysis of Tiger Neo 3.0 and BC

The PV industry has never stopped its pursuit of higher energy efficiency, as TOPCon becoming dominant technology, Jinkosolar continues to push the bleeding edge to raise the bar of cell efficiency over 27%.  Its latest Tiger Neo 3.0 claimed of 650-670Wp power output, 85+/- 5% Bifacility, -0.26% temp coefficient, -0.35% linear degradation, 96.77% low irradiance performance (200W/m²), etc., provides chance of lowering the levelised cost of energy (LCOE)than traditional TOPCon and N-type BC.

This paper is purposed to compare the LCOE of Tiger Neo 3.0 and its N-type BC in different scenarios as follows, based in the supposition that the price of Tiger Neo 3.0 is same with N-BC module,module information is listed in table 1. We chose four project scenarios (two rooftop, two utility scale) and four locations with typical climate features, irradiance levels and balance of system (BOS) cost levels.

Energy generation is simulated with the PVsyst software. The Tiger Neo 3.0 and N-type BC module PAN file is based on the actual performance provided by Jinkosolar while the PAN files of N-type BC are based on a general industry-wide performance level.

We chose four typical locations, including Kagoshima (Japan), Berlin (Germany), Dubai (UAE), Qinghai (China). Their annual average irradiance and annual average temperature are listed in table 2.

The calculation for LCOE is the net present value of total life cycle costs of the project, divided by the net present value of energy produced over the system’s lifetime. The total life cycle costs can be disaggregated as initial investment, annual cost, depreciation tax benefit and system residual value. The initial investment (US$/Wdc) is the sum of the BOS cost and the module price. Module prices and BOS cost of Tiger Neo 3.0 and N-type BC are assumed to be the same at each location.

The AC capacity of the utility-scale plant is designed to be 100MW, 1500V system voltage, single axis tracker, albedo 30% in Dubai and 120MW, 1500V system voltage, fixed mounted, 20% albedo in Qinghai . The system lifetime is 30 years.

Results

The energy yield gain of Tiger Neo 3.0 over N-type BC at modeled Dubai and Qinghai utility project is 3.52% and 3.28% respectively, primarily attributed to Tiger Neo 3.0’s  higherbifacility and outstanding performance at high temperature. Set LCOE of BC as baseline, the LCOE of Tiger Neo 3.0 is 3.45% and 3.60% lower in Dubai and Qinghai.

In contrast, the two rooftop projects of 500kW in Kagoshima,Japan and 1MW Berlin German features of low contribution of bifacility result in the less energy yield gain over BC of 0.54% and 0.77% respectively mainly due to better low light performance of Tiger Neo 3.0 as shown in table 3. Set LCOE of BC as baseline, the LCOE of Tiger Neo 3.0 is 1% and 1.11% lower in Kagoshima amd Berlin.

The two products of same power exhibit different performance in energy generation due to their differences in bifacial factors, performance in low irradiance, first-year degradation values which can be primarily attributed to light-induced degradation (LID).

Conclusion

It should be pointed out that the module prices of Tiger Neo 3.0 and N-type BC and BOS cost are assumed to be the same in LCOE analysis. In most cases, the LCOE of Tiger Neo 3.0 is lower  than N-type BC, and more competitive with fixed mounted or tracker system, high ground albedo, high temperature. In rooftop systems where bifacility advantage can not play to full, the better low irradiance performance of Tiger Neo 3.0 translates into longer working hour, which allows it to perform well throughout the year.

Regarding energy generation, Tiger Neo 3.0 is higher than N-type BC, especially in hot and sunny regions with high albedo. This is due to their advantage of high bifaciality and low temperature coefficient. On the other hand, in rooftop installations, particularly in high latitude with low  irradiance or humid regions with more rainy and cloudy weather, the advantage of low light performance of Tiger Neo 3.0 prolongs the generation hour per day and per year. In LCOE analysis, Tiger Neo 3.0 has the high priorities in most scenarios and all climate and environment.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Indian Green Energy Stocks See Mixed Trading As Sensex And Nifty Fall On October 1

    The Indian green energy sector witnessed a subdued trading session on Thursday, October 1, 2026, as broader market weakness put pressure on several renewable energy, solar, power, and electric mobility…

    Huawei Unveils Six Global Power Showcases, Unlocking a New Power System with AI-Energy Synergy

    During HUAWEI CONNECT 2026, Huawei held the 2026 Global Electric Power Summit under the title ” AI × Energy: Unlocking a New Power System.” More than 600 representatives from global…

    Have You Seen?

    Japan’s JERA Creates Oil Storage Firm to Manage National Reserve Sites

    • October 2, 2026
    Japan’s JERA Creates Oil Storage Firm to Manage National Reserve Sites

    Alaska LNG Hinges on How Much Asian Buyers Will Pay for Energy Security

    • October 2, 2026
    Alaska LNG Hinges on How Much Asian Buyers Will Pay for Energy Security

    WTI Sinks Nearly 4% as EU Weighs Emergency Stockpile Release

    • October 2, 2026
    WTI Sinks Nearly 4% as EU Weighs Emergency Stockpile Release

    Latest Dallas Fed Survey Reveals Theme Among Respondents

    • October 2, 2026
    Latest Dallas Fed Survey Reveals Theme Among Respondents

    What is the near-term feasibility of helium-3 fuel for fusion power?

    • October 2, 2026
    What is the near-term feasibility of helium-3 fuel  for fusion power?

    UN Says Global Fuel Subsidies Could Top $1 Trillion

    • October 2, 2026
    UN Says Global Fuel Subsidies Could Top $1 Trillion

    JERA CEO Warns LNG Prices Have Further to Climb

    • October 2, 2026
    JERA CEO Warns LNG Prices Have Further to Climb

    Scaling up: Blue Star’s next phase in Colorado

    • October 2, 2026
    Scaling up: Blue Star’s next phase in Colorado

    Shougang, Rio Tinto commission carbon capture trial facility at China steel plant

    • October 2, 2026
    Shougang, Rio Tinto commission carbon capture trial facility at China steel plant

    Oil Prices Come Under Pressure

    • October 2, 2026
    Oil Prices Come Under Pressure