Scatec ASA Secures 15-Year CfD for 190 MW Solar Portfolio in Romania

Representational image. Credit: Canva

Scatec ASA, a leading renewable energy solutions provider, has entered into a 15-year Contract-for-Difference (CfD) with Opcom, Romania’s electricity market operator. The agreement will cover approximately 70% of the estimated production from a 190 MW solar portfolio, with the remaining output to be sold on the Romanian wholesale electricity market.

The contracts were awarded during Romania’s first CfD auction, funded by the EU Modernisation Fund, an initiative supporting selected member states in achieving their energy transition targets. In this initial round, about 1.5 GW of solar PV and onshore wind capacity was awarded, with the remaining 3.5 GW of the 5 GW total auction plan anticipated in 2025.

With this CfD, Scatec is set to advance its first solar project portfolio in Romania, developed in collaboration with its local partner, Defic Globe. These projects are located in Dolj and Olt counties in southern Romania.

Romania offers strong market fundamentals, a robust energy transition agenda, and well-defined offtake routes through CfD auctions, corporate PPAs, and a mature electricity market. Scatec will hold a 65% ownership stake in the solar plants and oversee the procurement of key components, accounting for approximately 30% of the project’s total capital expenditure.

Defic Globe, a subsidiary of Emsolt Investments and YEO Teknoloji Enerji, will retain a 35% ownership stake and provide turnkey EPC services for the project. Additionally, Scatec will manage Operations & Maintenance (O&M) and Asset Management (AM) services for the solar portfolio. “We are very pleased with the award in Romania which demonstrates our ability to apply our global track record within renewable energy auctions to new markets. Romania has supportive market fundamentals where Scatec can utilise its competitive strengths to build a position. We look forward to continued collaboration with Defic Globe, which already has a strong position in the Romanian renewables market,” said Scatec CEO Terje Pilskog.

 

  • Related Posts

    India Daily: India Power Capacity Tops 550 GW, CEA Sets New Cybersecurity Rules, CSPDCL Advances 500 MWh BESS, India Accelerates Smart Meters, Kerala Rejects KINESCO Licence and More…

    India’s installed power capacity reached around 552 GW by July 2026, with non-fossil sources contributing more than 300 GW, or over 54% of the total. Solar has emerged as a…

    CERC Approves GNA Milestone Extensions With New Charges For Renewable Energy Projects

    The Central Electricity Regulatory Commission (CERC) has approved a uniform framework allowing renewable power developers additional time to meet key operational milestones under the General Network Access (GNA) Regulations. The…

    Have You Seen?

    Hormuz Tanker Traffic Slumps as U.S.-Iran Standoff Drags On

    • August 14, 2026
    Hormuz Tanker Traffic Slumps as U.S.-Iran Standoff Drags On

    Vance Says Cheap Oil and Gas Is Top U.S. Priority in Iran War

    • August 14, 2026
    Vance Says Cheap Oil and Gas Is Top U.S. Priority in Iran War

    Middle East Oil Tankers Are Going Dark for Longer

    • August 14, 2026
    Middle East Oil Tankers Are Going Dark for Longer

    Drone Strike Sparks Blaze at Key Russian Oil and Fuel Terminal

    • August 14, 2026
    Drone Strike Sparks Blaze at Key Russian Oil and Fuel Terminal

    Hormuz Crisis Pushes Asian Refiners Toward U.S. Oil

    • August 14, 2026
    Hormuz Crisis Pushes Asian Refiners Toward U.S. Oil

    India’s Coal Demand Set to Hit 1.6 Billion Tons by 2030

    • August 14, 2026
    India’s Coal Demand Set to Hit 1.6 Billion Tons by 2030

    Holcim UAE starts cement carbon capture pilot project

    • August 14, 2026
    Holcim UAE starts cement carbon capture pilot project

    Qatar Ras Laffan train five ‘goes offline’

    • August 14, 2026
    Qatar Ras Laffan train five ‘goes offline’

    Vietnam’s Bac Ninh semiconductor investment hits $2.7bn

    • August 14, 2026
    Vietnam’s Bac Ninh semiconductor investment hits $2.7bn

    India Daily: India Power Capacity Tops 550 GW, CEA Sets New Cybersecurity Rules, CSPDCL Advances 500 MWh BESS, India Accelerates Smart Meters, Kerala Rejects KINESCO Licence and More…

    • August 14, 2026
    India Daily: India Power Capacity Tops 550 GW, CEA Sets New Cybersecurity Rules, CSPDCL Advances 500 MWh BESS, India Accelerates Smart Meters, Kerala Rejects KINESCO Licence and More…