Convergent Energy Secures $584.5M Guaranteed Loan From The U.S. Department Of Energy To Drive Clean Energy Innovation

Representational image. Credit: Canva

Convergent Energy and Power, a top energy storage solutions provider in North America, has secured a $584.5 million guaranteed loan from the U.S. Department of Energy’s Loan Programs Office. The funding will support the development of a solar photovoltaic (PV) system with integrated battery storage and three standalone battery storage systems in Puerto Rico. These projects aim to enhance Puerto Rico’s energy resilience, lower energy costs, and contribute to the island’s clean energy and climate goals.

Frank Genova, Convergent’s CFO and Co-Founder, stated “Convergent has a long history of supporting an energy landscape that is less expensive, more reliable, and increasingly sustainable. As a leading developer of energy storage and solar PV systems, we have the expertise—and the capital—to bring Puerto Rico’s electric grid into the future. We look forward to enhancing grid reliability for communities across Puerto Rico.”

Convergent Energy and Power is building a 100 MW solar PV system paired with a 55 MW/55 MWh battery storage system in Coamo, Puerto Rico. Additionally, three standalone utility-scale battery storage systems will be installed in Caguas, Peñuelas, and Ponce. These projects will supply power directly to Puerto Rico’s grid, supporting its goal of 100% clean energy by 2050. By deploying solar and battery storage on a large scale, Puerto Rico can address its high energy costs, which are significantly higher than those on the U.S. mainland.

The clean electricity generated will help reduce reliance on diesel and coal power, cutting pollution and lowering carbon dioxide emissions. Convergent is collaborating with the Puerto Rico Department of Economic Development and Commerce to create a workforce development plan that prioritizes diversity and includes minority- and women-owned businesses as subcontractors where feasible. The project is expected to generate around 540 construction jobs.

 

  • Related Posts

    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    Enviromena has started construction of the Longpasture Solar Farm in County Durham, UK, marking a major milestone for the company’s second-largest UK project to date. The company acquired the project…

    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    Indian stock markets ended lower on August 24, 2026, as investors remained cautious amid selling pressure across benchmark indices. The S&P BSE SENSEX closed at 77,369.11, declining 0.22%, or around…

    Have You Seen?

    Exxon Eyes Shell’s $8 Billion U.S. Chemicals Business

    • August 24, 2026
    Exxon Eyes Shell’s $8 Billion U.S. Chemicals Business

    Iran Unveils Huge New Gas Discovery Amid U.S. Economic Pressure

    • August 24, 2026
    Iran Unveils Huge New Gas Discovery Amid U.S. Economic Pressure

    Norway Vows to Keep Drilling for Oil and Gas in the Arctic

    • August 24, 2026
    Norway Vows to Keep Drilling for Oil and Gas in the Arctic

    Japan Power Prices Surge to Highest Since 2023

    • August 24, 2026
    Japan Power Prices Surge to Highest Since 2023

    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    • August 24, 2026
    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    • August 24, 2026
    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    MPA Completes 780,000 kWh Solar Power System At Singapore’s Marina South Pier

    • August 24, 2026
    MPA Completes 780,000 kWh Solar Power System At Singapore’s Marina South Pier

    Solar SG Targets Next Growth Phase as Singapore Raises Solar Capacity Goal to 3 GWp by 2030

    • August 24, 2026
    Solar SG Targets Next Growth Phase as Singapore Raises Solar Capacity Goal to 3 GWp by 2030

    ACWA Signs Storage Services Agreements for 1.5 GW/6 GWh BESS Projects in Saudi Arabia

    • August 24, 2026
    ACWA Signs Storage Services Agreements for 1.5 GW/6 GWh BESS Projects in Saudi Arabia

    Lithuania approves EIA programme for Klaipėda CO2 terminal

    • August 24, 2026
    Lithuania approves EIA programme for Klaipėda CO2 terminal