LONGi Secures 100 MW in Solar Module Supply Contracts for Guatemala

Representational image. Credit: Canva

LONGi, the world’s leading solar technology manufacturer, has signed multiple supply agreements totaling approximately 100 megawatts (MW) of its high-efficiency Hi-MO 9 BC (Back Contact) solar modules in Guatemala. This milestone marks a major step in LONGi’s continued growth across Central America and reflects increasing regional demand for advanced photovoltaic solutions. “We are proud to bring our most advanced module technology to Guatemala,” said Antonio Morales, Regional Sales Coordinator for Mexico and Central America at LONGi. “These agreements reflect the continued trust in our BC solutions and strengthen LONGi’s position in the region’s growing renewable energy market.”

The Hi-MO 9 module, LONGi’s flagship offering for utility-scale projects, incorporates cutting-edge back contact (BC) technology to deliver superior energy output, enhanced temperature performance, and reduced degradation over time. Engineered for reliability and optimized generation in diverse environmental conditions, the Hi-MO 9 sets a new standard in solar efficiency and innovation.

 

  • Related Posts

    Philippine National Bank Backs PHP 6.22 Billion Solar And Battery Storage Project In Iloilo

    Philippine National Bank (PNB) is supporting a 6.22 billion peso co-financing package for a major clean energy project in Barotac Viejo, Iloilo, Philippines. Developed by Singapore-based Levanta Renewables, the project…

    SEPCOIII Begins Full Commercial Operation Of Saudi Red Sea Utility Project

    Chinese engineering company SEPCOIII has achieved full commercial operation of the Saudi Red Sea Utility Infrastructure Project, marking a major milestone in the development of renewable-powered tourism infrastructure. The project…

    Have You Seen?

    Philippine National Bank Backs PHP 6.22 Billion Solar And Battery Storage Project In Iloilo

    • August 31, 2026
    Philippine National Bank Backs PHP 6.22 Billion Solar And Battery Storage Project In Iloilo

    SEPCOIII Begins Full Commercial Operation Of Saudi Red Sea Utility Project

    • August 31, 2026
    SEPCOIII Begins Full Commercial Operation Of Saudi Red Sea Utility Project

    India Daily: MPERC Drafts MYT Rules, APSERC Reviews 2.75 MW Solar, HERC Clears Green Banking, TGERC Closes Dues Case, UPERC Completes ₹32.74 Cr Refund & More…

    • August 31, 2026
    India Daily: MPERC Drafts MYT Rules, APSERC Reviews 2.75 MW Solar, HERC Clears Green Banking, TGERC Closes Dues Case, UPERC Completes ₹32.74 Cr Refund & More…

    Iraq Plans 10 GW Solar Expansion To Tackle Power Shortages

    • August 31, 2026
    Iraq Plans 10 GW Solar Expansion To Tackle Power Shortages

    Green Energy Stocks Under Pressure As Indian Markets End Lower On August 31

    • August 31, 2026
    Green Energy Stocks Under Pressure As Indian Markets End Lower On August 31

    KPI Green Energy Advances 2.57 GWp IPP Portfolio, 1.16 GWp Energized

    • August 31, 2026
    KPI Green Energy Advances 2.57 GWp IPP Portfolio, 1.16 GWp Energized

    Tata Power Renewable Energy Commissions 100 MW Group Captive Solar Project In Tamil Nadu

    • August 31, 2026
    Tata Power Renewable Energy Commissions 100 MW Group Captive Solar Project In Tamil Nadu

    Australia Accelerates Next-Generation Solar R&D with $105.6 Million Technology Push

    • August 31, 2026
    Australia Accelerates Next-Generation Solar R&D with $105.6 Million Technology Push

    Global Specialty Gas Supply Chain Outlook – H1 2026

    • August 31, 2026
    Global Specialty Gas Supply Chain Outlook – H1 2026

    UPERC Approves 300 MW Solar PPA At INR 2.57/kWh For 25 Years In Uttar Pradesh

    • August 31, 2026
    UPERC Approves 300 MW Solar PPA At INR 2.57/kWh For 25 Years In Uttar Pradesh